Contact
Send Gerber, BOM and quantity for a quote with DFM notes within one business day. NDA available.
Request a quote
Tell us about the build. A real engineer will reply within one business day with pricing, lead time and DFM notes.
File checklist
What to send for the fastest quote
Missing a file is the most common reason a quote takes longer than 24 hours.
Gerber + drill
RS-274X Gerber files and NC drill in one archive. Include the layer stack-up if controlled impedance is required.
BOM
Reference designators, quantity, manufacturer part number and acceptable substitutes.
Centroid file
Pick-and-place data with X/Y coordinates, rotation and side for every placed component.
Quantity + date
Build quantity, board thickness, surface finish, assembly scope and your required delivery date.